Master Plan and Zone 3

Mpesa Foundation has supported the development of the park design and architecture master plan.
The objectives:

  • Geospatial survey of the park and of the river area with accuracy of +/- 300mm and data points every 1.2mts. Plus other analytical images such as gradient analysis, drainage network etc.
  • Develop a broad Masterplan drawing.
  • Develop specific strategies, design and implementation plans for each of the following sections of the Masterplan:
  • Signages (park utilities signages – sponsors/donors signages – paths signages)
  • Benches
  • Zone 3 (inclusive of entrance and parking area)
  • Solutions for two play area in the central loan and near the main house. Considering the removal of the Banda as a feasible solution.
  • Paths
  • River Area
  • Continue to offer guidance as part of the infrastructure committee advisory board.
Tags:
Share:
Contact Us

Sed ut perspiciatis unde omnis iste natus voluptatem accusantium doloremque laudantium totam reaperiam eaque ipsa quae ab illo inventore veritatis et quasi architecto beatae vitae dicta sunt explicabo.

Type what you are searching for:

YOUR CART

No products in the cart.

X